●Resin molding mold design
・Customer receipt documents (parts data, part drawings, specifications) ・3D modeling of molded parts ・Mold design work
●Production technology
CAM program creation (quality confirmation) work *Pre-production process for mass-produced parts
・Create a CAM program from mold data ・Injection molding trial ・Accuracy confirmation ・Mold repair (design department confirmation) ・Customer confirmation ・Delivery to manufacturing department
Jig (fixing jig, measuring jig) design work
・On-site inspection ・Drawing rough sketches ・Meeting with the manufacturing department ・Creating 3D data ・2D drawings ・Requesting manufacturing from the manufacturing department ・Assembly ・On-site inspection
〇 Equipment introduction (design)
・Production process review ・Mechanism review ・Meeting with the manufacturing department ・3D data creation ・2D drawing ・Parts list creation ・Manufacturing department request (ordering ready-made products) ・Assembly ・Prototype trial ・Quality confirmation *In the case of ready-made equipment, the equipment will be installed after meeting with the equipment supplier.
●Equipment maintenance work
・Periodic maintenance work (replacement of consumable parts according to checklists, etc.)
・Sudden repair response work: Determining the location of the failure based on drawings (circuit diagrams, relay diagrams) ・Repair work (including parts replacement and ordering)
・Pre-maintenance work: Inspection and replacement parts based on past data; Maintenance plan formulation